Windfarm (RUE "Grodnoenergo", 2016)
Unitary Enterprise “AES-komplekt”, together with the Chinese company HEAG, delivered and installed windfarm, which consists of 6 wind turbines of 1.5 MW total capacity 9 MW. The first turbine of 1.5 MW produced by HEAG was put into operation in 2011, five more turbines launched in 2015-2016. The connection of windfarm with national grid is arranged via 110/35/10kV substation "Vetropark".